![]() ![]() Since Gold Amalgam Hydrogen Generators and Power Transformers, and Gold Smart Batteries have a maximum operating Temperature of 125☌, we still need to cool the environment down, if ever so slightly, to. ![]() To cool the Hydrogen down one last time one may want to snake it through the steam chamber before exiting to a Power Plant. Now the Hydrogen Gas needs to be distributed to Hydrogen Generators. Since enough space is given, two Steam Turbines will easily manage the heat off the Vent. If both the Vent and pressure chamber are connected to a steam room, which in turn is cooled by a Steam Turbine, the Hydrogen's Temperature will easily drop down to 125☌.Įven if the Hydrogen Vent yields ~700g/s while active, this is only (700x2.4x375) 630kDTU/s, and approximately a third to half of that averaged out over its active period.Ī Steam Turbine deletes about 250kDTU/s when working with 125☌ Steam, and 334kDTU/s when working with 135☌ (the approximate Temperature at which Steam Turbines can still cool themselves down). Next, or simultaneously, the Hydrogen needs to reach a cold enough point at which it can be handled with Steel Equipment. That's point at which it over-pressurizes, and no longer yields any more Hydrogen.Īn unpowered Guide/Door Pump can easily transport the Hydrogen Gas away from the Vent and into a pressure chamber in which the Hydrogen can collect. The first step to take, as with any Geyser, is to ensure that it does not reach its P MAX. Hydrogen Vents provide Hydrogen and Heat, both primarly use is Power Generation, and fortunately, it is easy to tame the Vent. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |